• Accueil
  • Mediakit 🇫🇷 🇬🇧
    • Programme rédactionnel
    • Tarifs
    • Formats & infos techniques
    • Diffusion
  • Agenda
  • La Revue
  • L’équipe
  • Podcasts & vidéos
  • Derniers numéros
  • Linéaires
  • Alimentaire
  • Parfumerie & Cosmétique
  • Pharmacie
  • Industrie
    • Matériel
    • Matériaux
    • Emballages
  • News 🇬🇧
logo
  • Mediakit 🇫🇷 🇬🇧
    • Programme Rédactionnel
    • Tarifs
    • Formats & infos techniques
    • Diffusion
  • Agenda
  • La Revue
  • L’équipe
  • Podcasts & vidéos
  • Derniers numéros
S'abonner / subscribe linkedin
  • Accueil
  • Linéaires
  • Alimentaire
  • Parfumerie & Cosmétique
  • Pharmacie
  • Industrie
    • Matériel
    • Matériaux
    • Emballages
  • News 🇬🇧

Schubert inaugurates its new building project in Crailsheim

News 🇬🇧

posted Friday 22 April 2022

Packaging machine manufacturer Schubert’s is building a new final assembly hall with an office wing with a total area of over 12,000 square metres at a cost of 38 million euros and to be completed by June 2023 in Crailsheim.

Construction work is now beginning on the largest investment in the company’s history. “The expansion will open up space for 300 employees,” says Peter Schubert, Managing Partner at the company.

For the construction to be planned at all, the L2218 road between Crailsheim and Dinkelsbühl first had to be relocated in 2019. “Due to increased demand for our top-loading (TLM) packaging machines and our company’s growth, we had to consider back then how to expand our assembly areas,” recalls Ralf Schubert. The idea of relocating the road near the Schubert site to create a new building area convinced the city of Crailsheim as well as the Stuttgart Regional Council.

Texte Alternatif

Sustainability also played a major role in planning the new building. “We want to produce and manufacture in an entirely CO2-neutral way by the end of 2023, so the building will be equipped with a sustainable energy concept,” explains Ralf Schubert. After the geothermal energy already installed on the company premises was no longer approved at the site due to new regulations, the packaging machine manufacturer decided to use ice storage technology for heating and cooling. A photovoltaic system with an output of roughly 400 kWp (kilowatts-peak) will also be installed on the roof of the new building. “The objective is for the new hall to be operated in a climate-neutral manner,” he concludes.

All rights reserved except agreement written by Emballage Digest or mention of the magazine

Article Précédent

Thomas Ott as head of flexible packaging at Mondi

Article Suivant

Bormioli Pharma doubles the use of sustainable materials

Matériaux

News 🇬🇧

Plastics Recyclers Europe released first plastic recycling technologies mapping in Europe

posted Wednesday 04 February 2026

Machines

News 🇬🇧

Pharmacy

IMA Life strengthens partnership with Sharp Sterile Manufacturing

posted Monday 26 January 2026

News 🇬🇧

Packaging

Pharmacy

The Imker Group acquires stake in the Faller Packaging Group

posted Tuesday 20 January 2026

News 🇬🇧

Packaging

Pharmacy

Schreiner Group invests in state-of-the-art printing technology

posted Monday 19 January 2026

Abonnements

Trouvez l'abonnement qui vous convient

voir les offres
logo de Emballage Digest
  • Linéaires
  • Alimentaire
  • Parfumerie & Cosmétique
  • Pharmacie
  • Industrie
  • News 🇬🇧
  • Derniers numéros
  • L’équipe
  • Mediakit 🇫🇷 🇬🇧
  • La Revue
  • Agenda
  • Podcasts & vidéos
Mentions légales | Site conçu et réalisé par DEV INFLUENCE

© EMBALLAGE DIGEST - Tous droits réservés